Previous Next

The project included demolition on all ceilings and interior walls except elevator, stairwell, and electrical rooms, along with new ceilings and permanent interior wall systems for new toilet rooms, conference, and break rooms. Renovation to elevator lobbies and repair to existing exterior stone-clad wall systems was also included.

New plumbing, fire protection, alarm systems, HVAC systems, and a building automation system were replaced and installed, including installing new lighting and controls, electrical power systems, and new phone/data systems.

We're here to help you

Get In Touch

Discuss Your Project