Stryker Only a Few Months Away From The “Big" Move

When construction is completed on the Stryker Instruments building (foreground), it will be physically connected to their current building (background) by an open-air walkway.

Featured Project:
Stryker Instruments

Location: Portage, Michigan
Project Type: New Construction
Architect: Eckert Wordell
Completion Date: January 2006

In a few short months, a large portion of the staff at Stryker, Instruments Division, in Portage will shift operations from their old manufacturing plant to their attractive, new 200,000-squarefoot building. Total distance between the two facilities: about the length of a football field. "Instead of turning left from the driveway and into the old parking lot, employees will simply turn right and into the new one," says Curt Petersen, Project Director at CSM Group.

The new facility, which has a slightly smaller footprint than the old, is comprised of six light-assembly manufacturing pods, each averaging about 60' x 150' in size, and about 70 offices, lobby, fitness center and cafeteria, all flanking the factory floor. The office area for support staff and executives is a large, open space with "capped" private offices grouped together between open offices equipped with modular furniture. The assembly floor aisles continue into the office area, allowing the support staff direct access to the factory floor.

 

Portfolio of Industrial Construction Projects
As industrial construction specialists, we're often invited into the process early. CSM Group can help with every aspect - from supporting information for the Certificate of Need on the front end to documentation of compliance on the back end, adding value every step of the way.
 

 

 


Contact CSM Group:

Kalamazoo, MI
100 W. Michigan Avenue
Suite 200
Kalamazoo, MI 49007
Map to CSM Group

P: 269.746.5600
F: 269.746.5699

Grand Rapids, MI
600 Monroe Avenue, NW Suite 104
Grand Rapids, MI 49503
Map to CSM Group

P:616.458.5600
F:616.458.6099