CSM Group can streamline your school construction
project and help ensure its success by getting
involved at the very beginning. Long before the first concrete
floor is poured. Even before blueprints are finalized.
We assist with bond issues and help gain community
support. Prepare bid packages for contractors and manage
pre-bid meetings. Conduct post-bid interviews to ensure
compliance and to identify potential project savings. |

Location:
Marshall,
Michigan
Architect:
Wakely
Associates
|
Marshall Public Schools
Middle School
CSM Group acted as construction manager
for five separate building projects. The middle school was a three-story, 35,000-square-foot, historic addition,
which connects three buildings-along with renovations to two of those
three buildings.
|

Location:
Marshall,
Michigan
Architect:
Wakely
Associates
|
Marshall Public Schools
New Walters Elementary
The New Walters Elementary is a 65,000 sf state-of-the-art facility located on 10 acres adjacent to the current High School. The building contains all the elements of a new elementary along with a full size competition gymnasium.
|

Locations:
Kalamazoo, Michigan
Architect:
Tower Pinkster Titus
|
Kalamazoo Public Schools
In May of 2006, Voters approved $85 Million to upgrade district facilities, equipment and technology. CSM was selected to manage the construction of all KPS facilities including the construction of a new middle school and new elementary school. In all, 26 buildings will have some renovations and/or additions completed under this bond issue.
Go to Full Story
|

Locations:
Parchment, Michigan
Architect:
|
Parchment School District
The project includes a new gymnasium addition that will allow the existing gymnasium to become a multi-purpose space including cafeteria use, media center expansion, admin expansion, creation of a commons area, renovation of band space and voc-tech spaces, a new kitchen and building wide technology improvements. |

Location:
Marshall, Michigan
Architect:
Wakely
Associates |
Marshall Public Schools
Gordon Elementary
Gorden Elementary was a part of 8,000 sf additions and interior renovation of existing facilities by Marshall Public Schools. A complete exterior window replacement was planned. A major facet included during planning for these facilities is technology upgrades to maintain consistency with the New Elementary.
|
Location:
Marshall, Michigan
Architect:
Wakely
Associates
|
Marshall Public Schools
Hughes Elementary
Hughes Elementary was part of 8,000 sf additions to and interior renovation of existing facilities by Marshall Public Schools. A complete exterior window replacement was planned. A major facet included during planning for these facilities is technology upgrades to maintain consistency with the New Elementary. |

Location:
Kalamazoo, Michigan
Architect: |
Lakeside Treatment and Learning Center
The new 17,700 sf Diagnostic and Treatment Center includes living space for 20 individuals, multi-purpose recreation rooms, medical exam space and counseling and treatment offices. The Education facility has been renovated and expanded and renovations were undertaken on the existing residence cottages. The kitchen and bathroom facilities were renovated and new counseling offices have been added to each cottage. |

Location:
Battle Creek, Michigan
Architect:
Larry
Rizor, AIA |
Battle Creek Public Schools
CSM Group was hired to perform renovations to
the Battle Creek Central High School Life Management
Classroom and Principal / Administrative Offices. The
renovation work was located on the first and
third floors in a downtown setting, which created
site and building access challenges. |

Location:
Union
City, Michigan
Architect:
The
Design Forum, Inc. |
Union City Schools
This project was an addition
and remodel to the existing facility. The additions
consist of 16,000 sf additions and remodeling
of 6,000 sf. The structure is conventional
masonry block, brick and structural steel. A new
mechanical system has been installed throughout
the facility including new unit ventilation and
new boilers. |

Location:
Springport,
Michigan
Architect:
Diekema
Hamann Architects
|
Springport Schools
The
Design / Build Team of CSM Group with Diekema
/ Hamann Architects managed the construction
of the 54,400 SF Elementary School Additions
and Renovations which consisted of renovations
to the Lower Elementary, Upper Elementary, Chapter
1 Classroom, Article III Classroom and Media
Center. |

Location:
Portage, Michigan
Architect:
Tower
Pinkster Titus |
St. Michael Lutheran Church
Budget was
a significant Owner concern and CSM was able to
work with the designer to ensure the project was
designed and engineered to meet all of the Owner's
goals - cost, performance, size and quality. The project includes a new 22,500 square
foot building with a pre-engineered metal structural
frame with split-face masonry veneer. |
Location:
Kalamazoo, Michigan
Architect:
Byce Consulting Engineers
SKP Design |
Kalamazoo Advantage Academy
This project
is located in downtown Kalamazoo in the Columbia
Plaza Building. It consists of the renovation and
creation of a gymnasium for a charter school
in a portion of the building formerly containing
a night club and office space. |
Location:
Bloomingdale, Michigan
Architect:
|
Bloomingdale Public Schools
|
|
|
|
|
|
Contact
CSM Group:
Kalamazoo, MI
100 W. Michigan Avenue
Suite 200
Kalamazoo, MI 49007
Map
to CSM Group
P: 269.746.5600
F: 269.746.5699
Grand Rapids, MI
600 Monroe Avenue, NW Suite 104
Grand Rapids, MI 49503
Map
to CSM Group
P:616.458.5600
F:616.458.6099
|
|
|